Practical guide
Waste Processing Contractor MIS and Material Balance
A credible facility report reconciles material received with recovered output, rejects, dispatch and closing stock.

Implementation checklist
Use a material ledger
Opening stock, inward, recovered material, dispatch, reject and adjustment entries create a reviewable closing balance.
Retain transaction references
Vehicle, ticket, manifest, destination and operator references make reported quantities traceable during ULB review.
Frequently asked questions
Can manual weighbridge data be used?
Yes, with controlled entry and evidence where a suitable digital interface is unavailable.
